Reinstallation of BaaN IV Date: 30th December 1998 Sub: Successful Reinstallation of BaaN IV The BaaN Ivb2 along with the India Localisation was successfully reinstalled at Virgo Engineers Ltd on 30th December 1998 at 17:00 hours. for MCS Ltd. (Tech. Group) for Virgo Engineers Ltd. (Tech. Group) for MCS Ltd. for Virgo Engineers Ltd. SIM-I Sign-Off Document Date: 20th January 1999 Sub: Simulation & Piloting of Design, Cost A/c & Product Configutator The following Simulation & Piloting has been completed by MCS as a part of SIM-I activity today as per the agreed SIM-I schedule ? Design ? Cost A/c ? Product Configurator The relevant Gaps have been documented separately in the Gap Analysis Document by the respective KUG present today. Undersigned 1. 1. 2. 2. 3. 3. 4. 4. 5. 5. 6. 7. 8. 9. 10. 11. 12 13. 14. 15. 16. 17. 18. 19. 20. for Virgo Engineers Ltd. for MCS Ltd. SIM-I Sign-Off Document Date: 21st January 1999 & 22nd January 1999 Sub: Simulation & Piloting of Complete Simple Business Cycle The following Simulation & Piloting has been completed by MCS as a part of SIM-I activity today as per the agreed SIM-I schedule ? Complete Simple Business Process Cycle The relevant Gaps have been documented separately in the Gap Analysis Document by the respective KUG present today. Undersigned 1. 1. 2. 2. 3. 3. 4. 4. 5. 5. 6. 7. 8. 9. 10. 11. 12 13. 14. 15. 16. 17. 18. 19. 20. for Virgo Engineers Ltd. for MCS Ltd. SIM-I Sign-Off Document Date: 22nd, 23rd and 25th January 1999-01-25 Sub: Simulation & Piloting of Planning (Projects and MPS) and Sales Scenarios The following Simulation & Piloting has been completed by MCS as a part of SIM-I activity today as per the agreed SIM-I schedule ? Manufacturing Projects (on 517 product) ? Master Production Scheduling (on 525 product) The relevant Gaps have been documented separately in the Gap Analysis Document by the respective KUG present today. Undersigned 1. 1. Shrinivas Rao 2. 2. Akash Mavle 3. 3. Dilip Matta 4. 4. Shibasis Sarkar 5. 5. Aseem Saxena 6. 7. 8. 9. 10. 11. 12 13. 14. 15. 16. 17. 18. 19. 20. for Virgo Engineers Ltd. for MCS Ltd. SIM-I Sign-Off Document Date: 27th January 1999 Sub: Simulation & Piloting of Finance The following Simulation & Piloting has been completed by MCS as a part of SIM-I activity today as per the agreed SIM-I schedule ? Finance Scenarios The relevant Gaps have been documented separately in the Gap Analysis Document by the respective KUG present today. Undersigned 1. 1. Shrinivas Rao 2. 2. Akash Mavle 3. 3. Dilip Matta 4. 4. Shibasis Sarkar 5. 5. Aseem Saxena 6. 7. 8. 9. 10. 11. 12 13. 14. 15. 16. 17. 18. 19. 20. for Virgo Engineers Ltd. for MCS Ltd. o SIM-I Sign-Off Document Date: 27th January 1999 Th Sub: Simulation & Piloting of Production Scenarios The following Simulation & Piloting has been completed by MCS as a part of SIM-I activity today as per the agreed SIM-I schedule ? Production Scenarios The relevant Gaps have been documented separately in the Gap Analysis Document by the respective KUG present today. Undersigned 1. 1. Shrinivas Rao 2. 2. Akash Mavle 3. 3. Dilip Matta 4. 4. Shibasis Sarkar 5. 5. Aseem Saxena 6. 7. 8. 9. 10. 11. 12 13. 14. 15. 16. 17. 18. 19. 20. for Virgo Engineers Ltd. for MCS Ltd. SIM-I Sign-Off Document Date: 25th and 27th January 1999 Th Sub: Simulation & Piloting of Purchase and Stores Scenarios The following Simulation & Piloting has been completed by MCS as a part of SIM-I activity today as per the agreed SIM-I schedule ? Purchase Scenarios ? Stores Scenarios The relevant Gaps have been documented separately in the Gap Analysis Document by the respective KUG present today. Undersigned 1. 1. Shrinivas Rao 2. 2. Akash Mavle 3. 3. Dilip Matta 4. 4. Shibasis Sarkar 5. 5. Aseem Saxena 6. 7. 8. 9. 10. 11. 12 13. 14. 15. 16. 17. 18. 19. 20. for Virgo Engineers Ltd. for MCS Ltd. o SIM-I Sign-Off Document Date: 30th January 1999 Sub: Sign-Off of Simulation I of BaaN IVb implementation at Virgo Engineers Ltd. The Simulation I (SIM I) activity of the BaaN IVb ERP was completed successfully on 28th January 1999. for Virgo Engineers Ltd. for MCS Ltd. Lot & Location Control Training Date: 17th February 1999 Sub: Lot and Location Control Training The Lot & Location Control training was carried out from 15th to 17th February 1999 and successfully completed on 17th February 1999 Signed by Signed by 1) Mr. Soni 1) Akash 2) Mr. Pawar 2) Aseem 3) Mr. Vijay Garde 3) Shibasis 4) Dilip For Virgo Engineers Ltd. for MCS Ltd. Product Configurator Training Date: 18th February 1999 Sub: Product Configurator Training The Product Configurator training was carried out and successfully completed on 18th February 1999. Signed by Signed by 1) Mr. Rakhecha 1) Akash 2) Mr. Venkat 2) Aseem 3) Mr. Nagraj 3) Shibasis 4) Dilip For Virgo Engineers Ltd. For MCS Ltd. Training to Create New Company Date: 4th March 1999 Sub: Company Creation Training/Hands-on Training is given to create a new company 1) Create a new company 2) Create parameter tables 3) Enter necessary parameter tables to create first item After training they have also done hands on to create another company. Signed by Signed by 4) Nagraj 1) Mr Akash Mavle 5) Shriniwas 6) Shahaji for Virgo Engineers for MCS Ltd. Ltd. Creating Unix Users Date: 8th March 1999 Sub: Creation of Unix Users For creation of different unix users training given to create new users. This would be followed by creation of all the required Unix users. Signed by Signed by 7) Nagraj 1) Mr Akash Mavle 8) Shriniwas for Virgo Engineers for MCS Ltd. Ltd. DEM Training Date: 10th February 1999 Sub: DEM Training Dynamic Enterprise Modelling training was conducted successfully covering following 1) Petri-net modelling technique 2) Business process modelling 3) Defining Roles 4) Defining employees 5) Defining Responsibilities 6) Defining Master Data for DEM 7) User Dialog Generation 8) Exploration of Business Process Repository 9) DEM Exercises 10) Modelling of live flows of Virgo Signed by Signed by 9) Rakhecha 1) Akash 10) Vinay 2) Aseem 11) Shriniwas 3) Shibasis 12) Santosh 4) Dilip 13) Shettar 5) MV Rao 14) Venkat 15) Prashant 16) Nagraj for MCS Ltd. for Virgo Engineers Ltd. Installation of BaaN IV Date: 4th November 1998 Sub: Successful Installation of BaaN IV The BaaN Ivb2 along with the India Localisation was successfully installed at Virgo Engineers Ltd on 4th November 1998 at 14.45 hours. for MCS Ltd. (Tech. Group) for Virgo Engineers Ltd. (Tech. Group) for MCS Ltd. for Virgo Engineers Ltd. QMS Training Date: 12th February 1999 Sub: QMS Training Quality Management System training was conducted successfully covering following 11) QMS master data 12) Calibration 13) Order-Specific Inspection 14) Standard Inspection 15) Inspection in Shop Floor 16) Indpection during Purchase Signed by Signed by 17) Milind Picke 1) MV RAO 18) Rakecha 2) Aseem 19) Raghu 3) Shibasis 20) Rajiv Kulkarni 4) Dilip 21) 5) Akash For Virgo Engineers Ltd For MCS Parameter Settings for BaaN ERP Date: 13th January 1999 Sub: Finalised Parameters for BaaN ERP for Companies J 525 and J 517 The parameters were discussed and finalised for the BaaN RP for companies J 517 and J 525. The Parameters for the following packages were finalised: ? Manufacturing ? Distribution ? Finance The finalised parameters form a part of this sign-off for MCS Ltd. for Virgo Engineers Ltd. Tools Training Date: 26th February 1999 Sub: Tools Training Tools Customisation training was conducted successfully covering following 17) BaaN Architecture, Directory Structure and Features 18) User Interface 19) License Management 20) User Management 21) Authorisations 22) VRCs 23) Job Management 24) Database Management 25) Audit Management 26) Forms Customisation 27) Menu Customisation 28) Reports Customisation 29) Documentation 30) Text Management Signed by Signed by 22) Nagraj 23) Shriniwas 1) Milind Pai 24) Rakhecha 2) Akash Mavle 25) V. Bagul for Virgo Engineers for MCS Ltd. Ltd.